{"id":15045901812088,"title":"1600mm LH L Shaped Bath, Front Panel, Screen With 500mm Vanity \u0026 Toilet","handle":"nes-home-1600mm-lh-l-shaped-bath-front-panel-screen-with-500mm-vanity-toilet","description":"\u003cp\u003eTransform your daily routine with our elegant 1600mm L-shaped bath suite. The generously curved design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, matching front panel, freestanding doors vanity and toilet with soft close seat that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s6\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eToilet Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eWidth: 365mm\u003c\/li\u003e\n\u003cli\u003eProjection: 665mm\u003c\/li\u003e\n\u003cli\u003eMaterial: ceramic\u003c\/li\u003e\n\u003cli\u003eCistern overflow: internal\u003c\/li\u003e\n\u003cli\u003eSeat type: Soft close seat\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eVanity Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eVanity Width: 495mm\u003c\/li\u003e\n\u003cli\u003eBasin Width: 510mm\u003c\/li\u003e\n\u003cli\u003eCabinet Material: Water Resistant MDF\u003c\/li\u003e\n\u003cli\u003eBasin Material: Ceramic\u003c\/li\u003e\n\u003cli\u003eHandle Material: Polished Chrome Stainless Steel\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1598mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 405mm\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: left hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Front Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1595 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 780-795mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1430mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e1 x Bath Tub with Legs\u003c\/li\u003e\n\u003cli\u003e1 x Bath Screen\u003c\/li\u003e\n\u003cli\u003e1 x Front Bath Panel\u003c\/li\u003e\n\u003cli\u003e1 x Vanity with Basin\u003c\/li\u003e\n\u003cli\u003e1 x Toilet with Cistern\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Basin Tap, Waste, and End Panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e","published_at":"2026-08-06T11:17:06+01:00","created_at":"2026-08-06T11:17:01+01:00","vendor":"Nes Home","type":"Suite - Bath","tags":["acrylic","bath suites","bathroom suite","bathtub-length:1600","ceramic","close coupled toilet","freestanding vanity unit","height:1430","height:800","l shaped","length:1600","mdf","modern bathroom suites","projection:650-699","screen-height:1430","Suites","thickness:6","toilet-height:800","vanity-height:800","White","width:350-399","width:450-499","width:700-799"],"price":55999,"price_min":55999,"price_max":55999,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":55625545711992,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"L-160BATH-LFT+FP+SCRN+D500+8057","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"1600mm LH L Shaped Bath, Front Panel, Screen With 500mm Vanity \u0026 Toilet","public_title":null,"options":["Default Title"],"price":55999,"weight":1000000,"compare_at_price":null,"inventory_management":"shopify","barcode":"6485809109132","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-1.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-2.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-4.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-5.jpg?v=1786545910","\/\/neshome.co.uk\/cdn\/shop\/files\/D500FS-dimensions_d26c6fdd-c26a-4c40-952e-c2cefcc3f2f0.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/A-8057-dimensions-1600x1600_d3613e01-ea23-45f7-9a90-f9c7766c156e.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_20NSK705S-dimensions_3f8e03e9-ad8b-458b-8214-69f054afac3f.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/WBS303-dimensions_357b998a-505d-4298-8206-4b359d2afa6e.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_50a31315-cac0-4873-bfc1-0fc810b265a1.jpg?v=1786545911","\/\/neshome.co.uk\/cdn\/shop\/files\/nuie-premier-square-bath-leg-set-wbl001-174623-p_337361a6-0650-499a-8065-8b8c2ccbf5b1.jpg?v=1786545910"],"featured_image":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786545911","options":["Title"],"media":[{"alt":null,"id":66350861222264,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861255032,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-1.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-1.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861287800,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-2.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-2.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861320568,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-4.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-4.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861353336,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-5.jpg?v=1786545910"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-5.jpg?v=1786545910","width":1600},{"alt":null,"id":66350861386104,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/D500FS-dimensions_d26c6fdd-c26a-4c40-952e-c2cefcc3f2f0.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/D500FS-dimensions_d26c6fdd-c26a-4c40-952e-c2cefcc3f2f0.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861418872,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/A-8057-dimensions-1600x1600_d3613e01-ea23-45f7-9a90-f9c7766c156e.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/A-8057-dimensions-1600x1600_d3613e01-ea23-45f7-9a90-f9c7766c156e.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861451640,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_20NSK705S-dimensions_3f8e03e9-ad8b-458b-8214-69f054afac3f.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_20NSK705S-dimensions_3f8e03e9-ad8b-458b-8214-69f054afac3f.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861484408,"position":9,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS303-dimensions_357b998a-505d-4298-8206-4b359d2afa6e.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS303-dimensions_357b998a-505d-4298-8206-4b359d2afa6e.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861517176,"position":10,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_50a31315-cac0-4873-bfc1-0fc810b265a1.jpg?v=1786545911"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_50a31315-cac0-4873-bfc1-0fc810b265a1.jpg?v=1786545911","width":1600},{"alt":null,"id":66350861549944,"position":11,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/nuie-premier-square-bath-leg-set-wbl001-174623-p_337361a6-0650-499a-8065-8b8c2ccbf5b1.jpg?v=1786545910"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/nuie-premier-square-bath-leg-set-wbl001-174623-p_337361a6-0650-499a-8065-8b8c2ccbf5b1.jpg?v=1786545910","width":1000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003cp\u003eTransform your daily routine with our elegant 1600mm L-shaped bath suite. The generously curved design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, matching front panel, freestanding doors vanity and toilet with soft close seat that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s6\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eToilet Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eWidth: 365mm\u003c\/li\u003e\n\u003cli\u003eProjection: 665mm\u003c\/li\u003e\n\u003cli\u003eMaterial: ceramic\u003c\/li\u003e\n\u003cli\u003eCistern overflow: internal\u003c\/li\u003e\n\u003cli\u003eSeat type: Soft close seat\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eVanity Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eVanity Width: 495mm\u003c\/li\u003e\n\u003cli\u003eBasin Width: 510mm\u003c\/li\u003e\n\u003cli\u003eCabinet Material: Water Resistant MDF\u003c\/li\u003e\n\u003cli\u003eBasin Material: Ceramic\u003c\/li\u003e\n\u003cli\u003eHandle Material: Polished Chrome Stainless Steel\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1598mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 405mm\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: left hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Front Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1595 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 780-795mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1430mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e1 x Bath Tub with Legs\u003c\/li\u003e\n\u003cli\u003e1 x Bath Screen\u003c\/li\u003e\n\u003cli\u003e1 x Front Bath Panel\u003c\/li\u003e\n\u003cli\u003e1 x Vanity with Basin\u003c\/li\u003e\n\u003cli\u003e1 x Toilet with Cistern\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Basin Tap, Waste, and End Panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e"}