{"id":15046198460792,"title":"1800mm LH L Shaped Bath, Front Panel, Screen With 500mm Vanity \u0026 Toilet","handle":"nes-home-1800mm-lh-l-shaped-bath-front-panel-screen-with-500mm-vanity-toilet","description":"\u003cp\u003eTransform your daily routine with our elegant 1800mm L-shaped bath suite. The generously curved design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, matching front panel, freestanding doors vanity and toilet with soft close seat that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s6\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eToilet Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eWidth: 365mm\u003c\/li\u003e\n\u003cli\u003eProjection: 665mm\u003c\/li\u003e\n\u003cli\u003eMaterial: ceramic\u003c\/li\u003e\n\u003cli\u003eCistern overflow: internal\u003c\/li\u003e\n\u003cli\u003eSeat type: Soft close seat\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eVanity Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eVanity Width: 495mm\u003c\/li\u003e\n\u003cli\u003eBasin Width: 510mm\u003c\/li\u003e\n\u003cli\u003eCabinet Material: Water Resistant MDF\u003c\/li\u003e\n\u003cli\u003eBasin Material: Ceramic\u003c\/li\u003e\n\u003cli\u003eHandle Material: Polished Chrome Stainless Steel\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1798mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 405mm\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: left hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Front Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1795 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 780-796mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1430mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e1 x Bath Tub with Legs\u003c\/li\u003e\n\u003cli\u003e1 x Bath Screen\u003c\/li\u003e\n\u003cli\u003e1 x Front Bath Panel\u003c\/li\u003e\n\u003cli\u003e1 x Vanity with Basin\u003c\/li\u003e\n\u003cli\u003e1 x Toilet with Cistern\u003c\/li\u003e\n\u003cli\u003e1 x Soft Close Toilet Seat\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Basin Tap, Waste, and End Panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e","published_at":"2026-08-07T12:06:23+01:00","created_at":"2026-08-07T12:06:18+01:00","vendor":"Nes Home","type":"Suite - Bath","tags":["acrylic","bath suites","bathroom suite","bathtub-length:1800","ceramic","close coupled toilet","freestanding vanity unit","height:1430","height:800","l shaped","length:1800","mdf","modern bathroom suites","projection:650-699","screen-height:1430","Suites","thickness:6","toilet-height:800","vanity-height:800","White","width:350-399","width:450-499","width:700-799"],"price":56999,"price_min":56999,"price_max":56999,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":55626490347896,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"L-180BATH-LFT+FP+SCRN+D500+8057","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"1800mm LH L Shaped Bath, Front Panel, Screen With 500mm Vanity \u0026 Toilet","public_title":null,"options":["Default Title"],"price":56999,"weight":1000000,"compare_at_price":null,"inventory_management":"shopify","barcode":"6111240154843","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-1_23fdb14e-18cc-411a-8d06-cff0e0ce5f02.jpg?v=1786353595","\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-2_3af606ec-5a66-4b35-a8d5-23e60eef2d3a.jpg?v=1786353595","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-4.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-5.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/D500FS-dimensions_de588412-921b-4df8-8fb4-4ee5d37a3e6e.jpg?v=1786353596","\/\/neshome.co.uk\/cdn\/shop\/files\/A-8057-dimensions-1600x1600_0d9977b3-6e4b-4f85-8959-26f5dd30eb56.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_20NSK801S-dimensions_87f2ee42-b409-45ae-8e62-2d1b8e277fed.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_abbf0924-fc66-48fd-a8f7-453a1eb007d4.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_a4859338-d9af-4f3b-8c27-1ebc25c37c3b.jpg?v=1786353594","\/\/neshome.co.uk\/cdn\/shop\/files\/nuie-premier-square-bath-leg-set-wbl001-174623-p_36a92c1d-16e9-4aa6-90e1-72fe10864c03.jpg?v=1786353594"],"featured_image":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786353594","options":["Title"],"media":[{"alt":null,"id":66346177593720,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177626488,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-1_23fdb14e-18cc-411a-8d06-cff0e0ce5f02.jpg?v=1786353595"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-1_23fdb14e-18cc-411a-8d06-cff0e0ce5f02.jpg?v=1786353595","width":1600},{"alt":null,"id":66346177659256,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-2_3af606ec-5a66-4b35-a8d5-23e60eef2d3a.jpg?v=1786353595"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-160BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-2_3af606ec-5a66-4b35-a8d5-23e60eef2d3a.jpg?v=1786353595","width":1600},{"alt":null,"id":66346177692024,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-4.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-4.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177724792,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-5.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_2BFP_2BSCRN_2BD500_2B8057-5.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177757560,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/D500FS-dimensions_de588412-921b-4df8-8fb4-4ee5d37a3e6e.jpg?v=1786353596"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/D500FS-dimensions_de588412-921b-4df8-8fb4-4ee5d37a3e6e.jpg?v=1786353596","width":1600},{"alt":null,"id":66346177790328,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/A-8057-dimensions-1600x1600_0d9977b3-6e4b-4f85-8959-26f5dd30eb56.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/A-8057-dimensions-1600x1600_0d9977b3-6e4b-4f85-8959-26f5dd30eb56.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177823096,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_20NSK801S-dimensions_87f2ee42-b409-45ae-8e62-2d1b8e277fed.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-LFT_20NSK801S-dimensions_87f2ee42-b409-45ae-8e62-2d1b8e277fed.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177855864,"position":9,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_abbf0924-fc66-48fd-a8f7-453a1eb007d4.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_abbf0924-fc66-48fd-a8f7-453a1eb007d4.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177888632,"position":10,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_a4859338-d9af-4f3b-8c27-1ebc25c37c3b.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_a4859338-d9af-4f3b-8c27-1ebc25c37c3b.jpg?v=1786353594","width":1600},{"alt":null,"id":66346177921400,"position":11,"preview_image":{"aspect_ratio":1.0,"height":1000,"width":1000,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/nuie-premier-square-bath-leg-set-wbl001-174623-p_36a92c1d-16e9-4aa6-90e1-72fe10864c03.jpg?v=1786353594"},"aspect_ratio":1.0,"height":1000,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/nuie-premier-square-bath-leg-set-wbl001-174623-p_36a92c1d-16e9-4aa6-90e1-72fe10864c03.jpg?v=1786353594","width":1000}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003cp\u003eTransform your daily routine with our elegant 1800mm L-shaped bath suite. The generously curved design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, matching front panel, freestanding doors vanity and toilet with soft close seat that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s6\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eToilet Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eWidth: 365mm\u003c\/li\u003e\n\u003cli\u003eProjection: 665mm\u003c\/li\u003e\n\u003cli\u003eMaterial: ceramic\u003c\/li\u003e\n\u003cli\u003eCistern overflow: internal\u003c\/li\u003e\n\u003cli\u003eSeat type: Soft close seat\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eVanity Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 800mm\u003c\/li\u003e\n\u003cli\u003eVanity Width: 495mm\u003c\/li\u003e\n\u003cli\u003eBasin Width: 510mm\u003c\/li\u003e\n\u003cli\u003eCabinet Material: Water Resistant MDF\u003c\/li\u003e\n\u003cli\u003eBasin Material: Ceramic\u003c\/li\u003e\n\u003cli\u003eHandle Material: Polished Chrome Stainless Steel\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1798mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 405mm\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: left hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Front Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1795 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 780-796mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1430mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e1 x Bath Tub with Legs\u003c\/li\u003e\n\u003cli\u003e1 x Bath Screen\u003c\/li\u003e\n\u003cli\u003e1 x Front Bath Panel\u003c\/li\u003e\n\u003cli\u003e1 x Vanity with Basin\u003c\/li\u003e\n\u003cli\u003e1 x Toilet with Cistern\u003c\/li\u003e\n\u003cli\u003e1 x Soft Close Toilet Seat\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Basin Tap, Waste, and End Panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e"}