{"id":15046841565560,"title":"1800mm RH L Shaped Bath, Front Panel, Screen With 550mm Vanity \u0026 Toilet","handle":"nes-home-1800mm-rh-l-shaped-bath-front-panel-screen-with-550mm-vanity-toilet","description":"\u003cp\u003eTransform your daily routine with our elegant 1800mm L-shaped bath suite. The generously curved design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, matching front panel, freestanding doors vanity and toilet with soft close seat that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s6\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eToilet Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 720mm\u003c\/li\u003e\n\u003cli\u003eWidth: 370mm\u003c\/li\u003e\n\u003cli\u003eProjection: 665mm\u003c\/li\u003e\n\u003cli\u003eMaterial: ceramic\u003c\/li\u003e\n\u003cli\u003eCistern overflow: internal\u003c\/li\u003e\n\u003cli\u003eSeat type: Soft close seat\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eVanity Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 781mm\u003c\/li\u003e\n\u003cli\u003eWidth: 515mm\u003c\/li\u003e\n\u003cli\u003eCabinet Material: Water Resistant MDF\u003c\/li\u003e\n\u003cli\u003eBasin Material: Ceramic\u003c\/li\u003e\n\u003cli\u003eHandle Material: Polished Chrome Stainless Steel\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1798mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 405mm\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: right hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Front Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1796 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 780-795mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1430mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e1 x Bath Tub with Legs\u003c\/li\u003e\n\u003cli\u003e1 x Bath Screen\u003c\/li\u003e\n\u003cli\u003e1 x Front Bath Panel\u003c\/li\u003e\n\u003cli\u003e1 x Vanity with Basin\u003c\/li\u003e\n\u003cli\u003e1 x Toilet with Cistern\u003c\/li\u003e\n\u003cli\u003e1 x Soft Close Toilet Seat\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Basin Tap, Waste, and End Panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e","published_at":"2026-08-11T14:39:52+01:00","created_at":"2026-08-11T14:39:46+01:00","vendor":"Nes Home","type":"Suite - Bath","tags":["acrylic","bath suites","bathroom suite","bathtub-length:1800","ceramic","close coupled toilet","freestanding vanity unit","height:1430","height:720","height:781","l shaped","length:1800","mdf","modern bathroom suites","projection:650-699","right hand","screen-height:1430","Suites","thickness:6","toilet-height:720","vanity-height:781","White","width:350-399","width:500-549","width:700-799"],"price":51999,"price_min":51999,"price_max":51999,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":55628946899320,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"L-180BATH-RT+FP+SCRN+C550+ECO","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"1800mm RH L Shaped Bath, Front Panel, Screen With 550mm Vanity \u0026 Toilet","public_title":null,"options":["Default Title"],"price":51999,"weight":1000000,"compare_at_price":null,"inventory_management":"shopify","barcode":"2792220813611","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO.jpg?v=1786455590","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-3.jpg?v=1786455590","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-4.jpg?v=1786455590","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-5.jpg?v=1786455590","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-6.jpg?v=1786455589","\/\/neshome.co.uk\/cdn\/shop\/files\/C550FS-W-dimensions_c00783ac-f036-4c8c-9c54-90209ece2930.jpg?v=1786455589","\/\/neshome.co.uk\/cdn\/shop\/files\/Eco-Toilet-dimensions_c9f17a81-df98-46af-aa69-549e1359bdf9.jpg?v=1786455589","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_20NSK802S-dimensions_e775e3fe-c38b-4243-a5a1-1ec9a3beaef6.jpg?v=1786455589","\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_3460b31b-bc00-41f7-9d4e-0cc9b09455e8.jpg?v=1786455589","\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_a48fb796-043f-43af-89c2-bfd82ad4fb62.jpg?v=1786455589"],"featured_image":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO.jpg?v=1786455590","options":["Title"],"media":[{"alt":null,"id":66348873253240,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO.jpg?v=1786455590"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO.jpg?v=1786455590","width":1600},{"alt":null,"id":66348873286008,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-3.jpg?v=1786455590"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-3.jpg?v=1786455590","width":1600},{"alt":null,"id":66348873318776,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-4.jpg?v=1786455590"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-4.jpg?v=1786455590","width":1600},{"alt":null,"id":66348873351544,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-5.jpg?v=1786455590"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-5.jpg?v=1786455590","width":1600},{"alt":null,"id":66348873384312,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-6.jpg?v=1786455589"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_2BC550_2BECO-6.jpg?v=1786455589","width":1600},{"alt":null,"id":66348873417080,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/C550FS-W-dimensions_c00783ac-f036-4c8c-9c54-90209ece2930.jpg?v=1786455589"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/C550FS-W-dimensions_c00783ac-f036-4c8c-9c54-90209ece2930.jpg?v=1786455589","width":1600},{"alt":null,"id":66348873449848,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/Eco-Toilet-dimensions_c9f17a81-df98-46af-aa69-549e1359bdf9.jpg?v=1786455589"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/Eco-Toilet-dimensions_c9f17a81-df98-46af-aa69-549e1359bdf9.jpg?v=1786455589","width":1600},{"alt":null,"id":66348873482616,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_20NSK802S-dimensions_e775e3fe-c38b-4243-a5a1-1ec9a3beaef6.jpg?v=1786455589"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_20NSK802S-dimensions_e775e3fe-c38b-4243-a5a1-1ec9a3beaef6.jpg?v=1786455589","width":1600},{"alt":null,"id":66348873515384,"position":9,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_3460b31b-bc00-41f7-9d4e-0cc9b09455e8.jpg?v=1786455589"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_3460b31b-bc00-41f7-9d4e-0cc9b09455e8.jpg?v=1786455589","width":1600},{"alt":null,"id":66348873548152,"position":10,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_a48fb796-043f-43af-89c2-bfd82ad4fb62.jpg?v=1786455589"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS7-left-dimensions_a48fb796-043f-43af-89c2-bfd82ad4fb62.jpg?v=1786455589","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003cp\u003eTransform your daily routine with our elegant 1800mm L-shaped bath suite. The generously curved design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, matching front panel, freestanding doors vanity and toilet with soft close seat that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s6\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eToilet Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 720mm\u003c\/li\u003e\n\u003cli\u003eWidth: 370mm\u003c\/li\u003e\n\u003cli\u003eProjection: 665mm\u003c\/li\u003e\n\u003cli\u003eMaterial: ceramic\u003c\/li\u003e\n\u003cli\u003eCistern overflow: internal\u003c\/li\u003e\n\u003cli\u003eSeat type: Soft close seat\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eVanity Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eHeight: 781mm\u003c\/li\u003e\n\u003cli\u003eWidth: 515mm\u003c\/li\u003e\n\u003cli\u003eCabinet Material: Water Resistant MDF\u003c\/li\u003e\n\u003cli\u003eBasin Material: Ceramic\u003c\/li\u003e\n\u003cli\u003eHandle Material: Polished Chrome Stainless Steel\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1798mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 405mm\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: right hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Front Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1796 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 780-795mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1430mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e1 x Bath Tub with Legs\u003c\/li\u003e\n\u003cli\u003e1 x Bath Screen\u003c\/li\u003e\n\u003cli\u003e1 x Front Bath Panel\u003c\/li\u003e\n\u003cli\u003e1 x Vanity with Basin\u003c\/li\u003e\n\u003cli\u003e1 x Toilet with Cistern\u003c\/li\u003e\n\u003cli\u003e1 x Soft Close Toilet Seat\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Basin Tap, Waste, and End Panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e"}