{"id":15034920567160,"title":"L Shaped RH 1800mm Shower Bath Acrylic Front Panel \u0026 Screen","handle":"nes-home-l-shaped-rh-1800mm-curved-shower-bath-acrylic-front-panel-screen","description":"\u003cp\u003eTransform your daily routine with our elegant 1800mm L-shaped bath suite. The generous design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, and matching front panel that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s4\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1798mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 400mm (without legs)\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: right hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eFront Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1796 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 800-815mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1400mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath Tub with Legs\u003c\/li\u003e\n\u003cli\u003eBath Screen\u003c\/li\u003e\n\u003cli\u003eFront Bath Panel\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Tap, waste, panel clips \u0026amp; end panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e","published_at":"2026-06-18T11:33:45+01:00","created_at":"2026-06-18T11:33:40+01:00","vendor":"Nes Home","type":"Bath - L-Shaped","tags":["bath","l shaped","length:1800","screen-height:1400","screen-width:800","White","width:850","width:850-899"],"price":34999,"price_min":34999,"price_max":34999,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":55584320487800,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"L-180BATH-RT+FP+SCRN","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"L Shaped RH 1800mm Shower Bath Acrylic Front Panel \u0026 Screen","public_title":null,"options":["Default Title"],"price":34999,"weight":1000000,"compare_at_price":null,"inventory_management":"shopify","barcode":"2813992015796","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_58e1ba75-35a5-4114-a36f-3b0fc9ea3bac.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-2.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-3.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-4.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-5.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_20NSK802S-dimensions.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_e76c0350-ca4f-4072-9155-7bc587d77932.jpg?v=1789978017","\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS2-dimensions_7e0620b4-c64c-4041-88fb-3749eba00eba.jpg?v=1789978017"],"featured_image":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_58e1ba75-35a5-4114-a36f-3b0fc9ea3bac.jpg?v=1789978017","options":["Title"],"media":[{"alt":null,"id":66473699770744,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_58e1ba75-35a5-4114-a36f-3b0fc9ea3bac.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN_58e1ba75-35a5-4114-a36f-3b0fc9ea3bac.jpg?v=1789978017","width":1600},{"alt":null,"id":66473699803512,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-2.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-2.jpg?v=1789978017","width":1600},{"alt":null,"id":66473699836280,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-3.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-3.jpg?v=1789978017","width":1600},{"alt":null,"id":66473699869048,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-4.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-4.jpg?v=1789978017","width":1600},{"alt":null,"id":66473699901816,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-5.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_2BFP_2BSCRN-5.jpg?v=1789978017","width":1600},{"alt":null,"id":66473699934584,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_20NSK802S-dimensions.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/L-180BATH-RT_20NSK802S-dimensions.jpg?v=1789978017","width":1600},{"alt":null,"id":66473699967352,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_e76c0350-ca4f-4072-9155-7bc587d77932.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/WBS304-dimensions_e76c0350-ca4f-4072-9155-7bc587d77932.jpg?v=1789978017","width":1600},{"alt":null,"id":66473700000120,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS2-dimensions_7e0620b4-c64c-4041-88fb-3749eba00eba.jpg?v=1789978017"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/neshome.co.uk\/cdn\/shop\/files\/NSBS2-dimensions_7e0620b4-c64c-4041-88fb-3749eba00eba.jpg?v=1789978017","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003cp\u003eTransform your daily routine with our elegant 1800mm L-shaped bath suite. The generous design offers maximum freedom of movement under the shower and an incredibly comfortable, deep-soaking lounging experience. The complete set features a contemporary bath, a glass screen, and matching front panel that blend minimalist style with everyday functionality.\u003c\/p\u003e\n\n\u003cdiv class=\"row specification s4\"\u003e\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eL-Shaped Bath Specifications\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath length: 1798mm\u003c\/li\u003e\n\u003cli\u003eBath width: 850mm (widest point), 705mm\u003c\/li\u003e\n\u003cli\u003eBath height: 400mm (without legs)\u003c\/li\u003e\n\u003cli\u003eMaterial: acrylic\u003c\/li\u003e\n\u003cli\u003eFinished: white\u003c\/li\u003e\n\u003cli\u003eDirection: right hand\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eFront Panel\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFront panel height: 500 mm\u003c\/li\u003e\n\u003cli\u003eFront panel length: 1796 mm\u003c\/li\u003e\n\u003cli\u003eFront panel depth: 170 mm\u003c\/li\u003e\n\u003cli\u003eFront panel lip thickness: 25 mm\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003eBath Screen\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eShower screen width: 800-815mm\u003c\/li\u003e\n\u003cli\u003eShower screen height: 1400mm\u003c\/li\u003e\n\u003cli\u003eGlass Thickness: 6mm\u003c\/li\u003e\n\u003cli\u003eShower screen is reversible\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\n\u003cdiv class=\"spec\"\u003e\n\u003cp\u003e\u003cb\u003ePackage Contents\u003c\/b\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBath Tub with Legs\u003c\/li\u003e\n\u003cli\u003eBath Screen\u003c\/li\u003e\n\u003cli\u003eFront Bath Panel\u003c\/li\u003e\n\u003cli\u003e\n\u003cb\u003ePlease Note:\u003c\/b\u003e Tap, waste, panel clips \u0026amp; end panel are not included.\u003c\/li\u003e\n\u003c\/ul\u003e \u003c\/div\u003e\n\u003c\/div\u003e"}